Dear all,
I wish to retrieve graphics modified time. I used FOLDER file to retrieve the details of the pictures. It works on both Unix and Windows XP. But when comes to Windows Server 2008 R2, I get the wrong time. GIven one of the example, one of the picture time modified time should be 03:35:40 P.M. which is mean as CTIME value 153540, however, i get the time value as 073540. And i had check the rest of the graphics, it also different 8 hours accurately.
I wonder this problem is it because of time zone problem? (I am staying in Malaysia and the time zone for here is UTC/GMT +8). I had go to control panel --> date and time and I checked the time zone is set to UTC +08:00 but it still not worked.
Thanks for taking your time on reading this problem.
Kai
- ProIV Resource Centre
- → Viewing Profile: Topics: Kai
Community Stats
- Group Members
- Active Posts 11
- Profile Views 3,709
- Member Title Member
- Age Age Unknown
- Birthday Birthday Unknown
-
Gender
Not Telling
Previous Fields
-
Year Started ProIV
Not Specified
-
Highest ProIV Version Used
Not Specified
0
Neutral
User Tools
Friends
Kai hasn't added any friends yet.
Topics I've Started
Improper time retrieved
06 December 2012 - 03:11 AM
XML temporally directory
25 October 2012 - 09:13 AM
Dear all,
I am here to asking question again. XD
Assume I want to create a PDF report by setting the spooler as below,
1. Output Type = 'XML - to Screen'
2. Client File = 'Test.pdf'
3. XML Transform = 'Test.xsl'
After this report had been execute in PROIV 6.2, it will pass the data in XML to XSL. So where does the temporally file for XML save in while passing data? If not, may I know how PROIV pass XML data to XSL? If yes, how I know where does the directory saved in?
Thanks for consume your time to read and help. =)
I am here to asking question again. XD
Assume I want to create a PDF report by setting the spooler as below,
1. Output Type = 'XML - to Screen'
2. Client File = 'Test.pdf'
3. XML Transform = 'Test.xsl'
After this report had been execute in PROIV 6.2, it will pass the data in XML to XSL. So where does the temporally file for XML save in while passing data? If not, may I know how PROIV pass XML data to XSL? If yes, how I know where does the directory saved in?
Thanks for consume your time to read and help. =)
add user to LOGON
17 August 2012 - 01:42 AM
Hi all.
I would like to ask, if we want to write a program that will add user to the system, can I directly use LOGONF to insert the user?
PROIV version 6.2.35
Thanks very much.
I would like to ask, if we want to write a program that will add user to the system, can I directly use LOGONF to insert the user?
PROIV version 6.2.35
Thanks very much.
Error 810 Unable to access XSL transform
14 August 2012 - 09:24 AM
Hi all, again I would like to ask question again ><, I hope this is not annoying.
I had face the problem of 810 Unable to access XSL Transform.
I had created manually a .xsl and move them into the default path ( should be \opt\pro60\...\virtual_machine\xsl ).
Is that have any method to find the path that I should import to? I had found in "help" but I cannot find a solution.
Thank you for spending your time.
I had face the problem of 810 Unable to access XSL Transform.
I had created manually a .xsl and move them into the default path ( should be \opt\pro60\...\virtual_machine\xsl ).
Is that have any method to find the path that I should import to? I had found in "help" but I cannot find a solution.
Thank you for spending your time.
Generate PDF report
10 August 2012 - 03:27 AM
Hi all.
I am new user of PROIV 6.2. I would like to ask some stupid question.
I did explore for how to set the XML tag in static variable in control break. So far I know it is impossible to set it directly. I found there was some suggestion like LSCALL on control break. However, I am still no idea with that.
In my report, control break normally is using to calculate subtotal. I had tried to cancel all of the control break and add more level of report cycle to calculate the subtotal. I am succeed in retrieve the subtotal in correct value. However, I am been assigned to explore more easier and flexible method to solve this problem because there are still have many of them using the same technique ( control break to calculate subtotal ) in our project's reports. It would be very take time to edit all of them.
Therefore, I would like to ask is there have any other method to retrieve the value and convert into XML without edit too much of them?
Thanks you and sorry for my poor English.
Kai.
I am new user of PROIV 6.2. I would like to ask some stupid question.
I did explore for how to set the XML tag in static variable in control break. So far I know it is impossible to set it directly. I found there was some suggestion like LSCALL on control break. However, I am still no idea with that.
In my report, control break normally is using to calculate subtotal. I had tried to cancel all of the control break and add more level of report cycle to calculate the subtotal. I am succeed in retrieve the subtotal in correct value. However, I am been assigned to explore more easier and flexible method to solve this problem because there are still have many of them using the same technique ( control break to calculate subtotal ) in our project's reports. It would be very take time to edit all of them.
Therefore, I would like to ask is there have any other method to retrieve the value and convert into XML without edit too much of them?
Thanks you and sorry for my poor English.
Kai.
- ProIV Resource Centre
- → Viewing Profile: Topics: Kai
- Privacy Policy